GNPC
G N P C
Image

GAS SYSTEM TRIP ON JUBILEE (KWAME NKRUMAH) FPSO

Accra, 11 May 2025: We wish to inform our stakeholders that on 10th May 2025, at approximately 4:30 PM, the Jubilee Floating Production Storage and Offloading (FPSO) vessel experienced a technical issue that temporarily affected gas export to the Atuabo Gas Processing Plant (GPP). 

The operator is making every effort to identify the root cause of the problem, implement the necessary corrective measures, and restore gas supply to the Atuabo GPP as quickly and safely as possible. Our technical teams are working with the operator to resolve the issue.

We wish to assure the public that the oil production system on the FPSO remains unaffected and continues to operate steadily.

We appreciate your continued support and understanding.

                                                                                                   ENDS